Facilitator: Parithosh Jayanthi
Next Steps
- Pari to follow up with Nimbus on attestation packing fix.
- Daniel to provide update on Besu teams validators running into hardware bottlenecks.
- DevOps to:
- Prepare and execute a round of mainnet shadow fork testing.
- DevOps to update
eth-clients
metadata for the fork date. - Testing teams to continue running tests and raise issues as needed.
- Problabs will publish Blob analysis results.
- Danno to submit PR for EIP editors’ review by tomorrow.
- Update and finalize test plan.
- Add more clients to EOF Devnet 1.
- Plan Devnet 2 (including opcodes).
- Parithosh and team will begin internal planning for Fusaka Devnet post-EOF.
- Parithosh will prepare for livestreaming of future testing calls.
Pectra – Hoodi
- Pari: Validator tests are complete; all intended features have been covered and the network looks stable.
- Pari: Noted an orphan block on Sepolia (by Teku); believed to be a one-off, and Teku is investigating.
- Sam: Continuing to analyze attestation performance.
- Terence (Prysm team):
- Prysm updated attestation handling – changes merged.
- No bugs reported; focus currently on proposer logic, not full network analysis.
- pk910: Cross-withdrawal address consolidation is still pending, but other teams have tested and confirmed it’s feasible.
- Pari: Will wait to see if Nimbus corrects attestation packing.
- Nico: No notable changes in the last 7 days.
- Daniel:
- Tested 25k validators on one Lighthouse node.
Specs & MEV Testing
- Mario Vega: Specs testing ongoing. Test suites being re-reviewed and executed against all clients. No major issues found yet.
- MEV testing is active – consistent stream of MEV blocks being observed.
- Partition tool has been used to gather client-side fixes, collected from clients’ retrospective reviews.
- Pawan: Diff fuzzer has been running all EF test cases for a week – no crashes so far.
- Terence: Mainnet fork date update required in upstream specs.
- nflaig: Confirmed that update is likely only needed at:
eth-clients/mainnet/config.yaml
- Pari: DevOps team will handle the update in the repo.
PeerDAS
- Pari shared link: PeerDAS Devnet 6
- Barnabas Busa:
- Devnet 6 setup in progress with Kurtosis.
- Lighthouse and Grandine clients integrated.
- Geth team aware of issues; fix pending.
- Marius: Code is fixed but slow; better hardware may help.
- Pari: PR submitted by Barnabas to Kurtosis. All spam tools expected to work.
- Problabs is analyzing mainnet blob usage; report to be published in coming days.
- Marius: Geth does not yet support RPC v2 – patch expected tomorrow.
- Barnabas: Asked for clarification – whether the fix relates to a v1 wrapper. Parithosh confirmed it.
EOF (EVM Object Format)
- Danno:
- Working to roll out specs for EOF.
- Test plan (including EEST) will be updated.
- EVM 1 is already running EEST.
- Having 3 clients running will be nice to have – aiming for more.
- ETA for EOF Devnet 1 aligns with Pectra fork timeline.
- EOF Devnet 2 will include Opcode changes.
- Pari asked if PeerDAS EL version is easy to rebase.
- Marius + Roman: Confirmed rebasing is straightforward.
- After EOF Devnet 1 is stable, Fusaka Devnet planning will start (Interop, June).
- Pari shared: EOF Devnet 1
- Livestreaming:
- Danno: Shared concerns but agreed livestreaming will be needed eventually.
- Async fallback: Use Party Lounge when needed.